Product CategoryProduct ListOnline Service |
Quotation
Unit:Â RMB
Note:
1.The manufacture standard is in GB code.
2.The quotation does not include installation and design of the boiler house. And freight is not included.
3.The technical service fee is $100USD for each engineer per day overseas. Or Zhengzhou Boiler Co., Ltd. Only pay the engineer in domestic, after leaving PR China, the technical service fee shall be paid by purchaser.
4.All equipment above could be selected to chose buy or not as you wish, except the boiler proper.
5.The final price shall be decided by two parties without any disagreement.
economizer has been presented above, want more similar products, please click air preheater,fuel gas duct,feed piping.
Our economizer is good in quality and competitive in price. We manufacture economizer and supply OEM, ODM service according to your requirement. If you want more detailed information of this product or related problems, please contact with us, we will reply as soon as possible (general in 24 hours). Category: parts of boilers
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||



